Some of you remember I had just installed a Baker open primary on my Mastiff and was having trouble adjusting the clutch, I received some technical advice and proceeded to put the bike on the lift. Unfortunately the bike fell as i turned to get straps from my tool chest. I had the insurance co. tow the bike to a custom shop that built a buddy's bobber. This is where the saga began, The guy estimated $7698 to fix the bike see below;
REPAIR OWNERS CHOICE MD 10 DAYS TO REPAIR
FACILITY: LICENSE #
2007 OTHE MASTIFF GREEN INT:
VIN: 5J11MBJB67W000368 LIC: D64147 MD PROD DATE: ODOMETER: 12572
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
1# REPL HEADLAMP 1 119.95 INCL.*
2# REPL UPPER TRIPLE TREE 1 181.50 INCL.*
3# REPL LOWER TRIPLE TREE 1 199.10 INCL.*
4# REPL RT BRAKE LEVER 1 80.21 INCL.*
5# REPL RT FORWARD CONTROL 1 407.00 INCL.*
6# REPL FRT TURN SIGNAL ASSY 1 22.94 INCL.*
7# REPL REAR BRAKE SIGNAL 1 22.94 INCL.*
8# REPL SUPER TRAPP EXAS/CHROME 1 719.00 INCL.*
9# REPL BRAKE FLUID 1 8.99 INCL.*
10# REPL WWIRING FOR LLAMPS 1 20.00 INCL.*
11# R&I HANDLE BARS INCL.*
12# R&I FRT FENDER INCL.*
13# R&I REAR FENDER INCL.*
14# R&I FRT WHEEL INCL.*
15# R&I FRT BRAKE SYSTEM INCL.*
16# R&I COMPLETE FRT END INCL.*
17# R&I HEADLAMP INCL.*
18# R&I SEAT INCL.*
19# R&I FUEL TANK AND COMPONANTS INCL.*
1
08/21/2012 AT 03:11 PM 0383187190105025-01
21332 0GGK19P7
ESTIMATE OF RECORD
2007 OTHE MASTIFF GREEN INT:
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
20# R&I REAR DRIVE BELT INCL.*
21# R&I REAR SWING ARM INCL.*
22# RPR LABOR FOR ABOVE OPERATIONS 25.0
23# SUBL APPRASIAL NON CCC ESTIMATE 1 150.00 X
24# SUBL PAINT WORK 1 900.00 X
25# SUBL CUSTOM PAINT WORK 1 800.00 X
26# SUBL BODY REPAIRS 1 325.00 X
27# MATERIALS FOR PAINT AND 1 858.00
CUSTOME WORK
28# SUBL SHIPPING 1 600.00 X
-------------------------------------------------------------------------------
SUBTOTALS ==> 5414.63 25.0 0.0
-------------------------------------------------------------------------------
ESTIMATE NOTES:
BIG DOG M/C NO DATA BASE PRICES FOR PARTS LISTED FROM BDM PERFORMANCE. LABOR
FROM SHOP PAINT AND CUSTOM ART WORK FROM TOON TOWN PAINT
TOONTOWNPAINT@HOTMAIL.COM
-------------------------------------------------------------------------------
PRIOR DAMAGE NOTES:
NONE SEEN
PARTS 2639.63
BODY LABOR 25.0 HRS @$ 85.00/HR 2125.00
SUBLET/MISC. 2775.00
----------------------------------------------------
SUBTOTAL $ 7539.63
SALES TAX $ 2639.63 @ 6.0000% 158.38
----------------------------------------------------
TOTAL COST OF REPAIRS $ 7698.01
ADJUSTMENTS:
DEDUCTIBLE 500.00
----------------------------------------------------
TOTAL ADJUSTMENTS $ 500.00
NET COST OF REPAIRS $ 7198.01
REPAIR OWNERS CHOICE MD 10 DAYS TO REPAIR
FACILITY: LICENSE #
2007 OTHE MASTIFF GREEN INT:
VIN: 5J11MBJB67W000368 LIC: D64147 MD PROD DATE: ODOMETER: 12572
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
1# REPL HEADLAMP 1 119.95 INCL.*
2# REPL UPPER TRIPLE TREE 1 181.50 INCL.*
3# REPL LOWER TRIPLE TREE 1 199.10 INCL.*
4# REPL RT BRAKE LEVER 1 80.21 INCL.*
5# REPL RT FORWARD CONTROL 1 407.00 INCL.*
6# REPL FRT TURN SIGNAL ASSY 1 22.94 INCL.*
7# REPL REAR BRAKE SIGNAL 1 22.94 INCL.*
8# REPL SUPER TRAPP EXAS/CHROME 1 719.00 INCL.*
9# REPL BRAKE FLUID 1 8.99 INCL.*
10# REPL WWIRING FOR LLAMPS 1 20.00 INCL.*
11# R&I HANDLE BARS INCL.*
12# R&I FRT FENDER INCL.*
13# R&I REAR FENDER INCL.*
14# R&I FRT WHEEL INCL.*
15# R&I FRT BRAKE SYSTEM INCL.*
16# R&I COMPLETE FRT END INCL.*
17# R&I HEADLAMP INCL.*
18# R&I SEAT INCL.*
19# R&I FUEL TANK AND COMPONANTS INCL.*
1
08/21/2012 AT 03:11 PM 0383187190105025-01
21332 0GGK19P7
ESTIMATE OF RECORD
2007 OTHE MASTIFF GREEN INT:
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
20# R&I REAR DRIVE BELT INCL.*
21# R&I REAR SWING ARM INCL.*
22# RPR LABOR FOR ABOVE OPERATIONS 25.0
23# SUBL APPRASIAL NON CCC ESTIMATE 1 150.00 X
24# SUBL PAINT WORK 1 900.00 X
25# SUBL CUSTOM PAINT WORK 1 800.00 X
26# SUBL BODY REPAIRS 1 325.00 X
27# MATERIALS FOR PAINT AND 1 858.00
CUSTOME WORK
28# SUBL SHIPPING 1 600.00 X
-------------------------------------------------------------------------------
SUBTOTALS ==> 5414.63 25.0 0.0
-------------------------------------------------------------------------------
ESTIMATE NOTES:
BIG DOG M/C NO DATA BASE PRICES FOR PARTS LISTED FROM BDM PERFORMANCE. LABOR
FROM SHOP PAINT AND CUSTOM ART WORK FROM TOON TOWN PAINT
TOONTOWNPAINT@HOTMAIL.COM
-------------------------------------------------------------------------------
PRIOR DAMAGE NOTES:
NONE SEEN
PARTS 2639.63
BODY LABOR 25.0 HRS @$ 85.00/HR 2125.00
SUBLET/MISC. 2775.00
----------------------------------------------------
SUBTOTAL $ 7539.63
SALES TAX $ 2639.63 @ 6.0000% 158.38
----------------------------------------------------
TOTAL COST OF REPAIRS $ 7698.01
ADJUSTMENTS:
DEDUCTIBLE 500.00
----------------------------------------------------
TOTAL ADJUSTMENTS $ 500.00
NET COST OF REPAIRS $ 7198.01