Winter maintenance/upgrades to the Big Dog (2007 Mastiff) are about complete just in time for Spring. Replaced original emissions camshaft with S&S higher performance .585 cam, new S&S lifters, new Avon treads, new wheel bearings, new binders, and all fluids changed.
Polished all her metal today while she was a part.
I am most grateful to Curtis at Wildsteed Works does a great job taking care of us and Donna and her husband as well at bigdog parts.
These bikes are special and deserve the best.
Polished all her metal today while she was a part.
I am most grateful to Curtis at Wildsteed Works does a great job taking care of us and Donna and her husband as well at bigdog parts.
These bikes are special and deserve the best.
Attachments
-
270.9 KB Views: 32
-
265.6 KB Views: 31
-
208.2 KB Views: 31