Well got some good measurements on the front end today with Al Hall, who is going to lathe down the spacers to the proper fit.
Then we fished some of the ignition wires thru the back bone and get them ready for wiring.
Ran the wiring from the corner of the battery tray and up the backbone. Zipped tied all out of the way.
Out the back bone comes the coil hot and ignition wires
Then I took a olhm meter to the new key switch to check wires, then added some connectors to the end to mate up with the key wires I also put different connectors on.
Key
bike wiring went from these bdm pins
to these to mate up with the key switch
Make a jumper wire for the coil to coil connection
Then add on connecotrs to the ignition wires that will plug into the coils
All done here ready for key, motor, and coil mounts
A super short day today, cause running out of things to do as I wait on more parts from various F'ups that were out of my control as I have elude before about
As you can see, I was able to ditch the other table, which is a good sign for sure.
The current one table setup is still packed
Not a whole lot of things to do. Mostly buttoning up some things. and then of coarse trying to see if the electronics will work then "FIRE IT UP!"